As of 2.8.17
[Fix] ISE: Washington CEDARS K Report: Updated the logic so that the file will no longer add additional lines for a student UNLESS there is a change in the LRE at the time of the IEP review.
As of 1.27.17

[Fix] ISE: MMSE REED: Corrected spelling errors on the PLAN Page of the MMSE REED.

[Fix] ISE: The MMSE REED Plan PDF no longer has the line, "The Initial IEP will be held on or before..."

[Fix] ISE: Corrected Error Message on the Close Page of MMSE REED from 30 school days to 45 Calendar Days